Informe trimestral correspondiente al periodo finalizado el 31 de marzo 24
26 de abril de 2024
Informe trimestral correspondiente al periodo finalizado el 31 de marzo 2024 |
Aura energía limitada (ASX: AEE, OBJETIVO: AURA) ("Aura" o la "Compañía") is pleased to provide an overview of activities for the period ended 31 March 2024 ("Trimestre"O"Período de información") to accompany the Appendix 5B. The priorities for Aura remain the development of the Tiris Uranium Project in Mauritania ("Tirís") and advancement of the Häggån Polymetallic Project in Sweden ("Häggån"). To view Appendix 5B, please click here: http://www.rns-pdf.londonstockexchange.com/rns/1885M_1-2024-4-26.pdf DESTACADOS: Tiris Front End Engineering Design[ 1 ] ("FEED") study confirms excelente economía supporting the near term- development of Tiris, into a globally significant uranium operation: Ø NPV8% of US$366 million, IRR of 34% post tax and 2.5 year payback Ø Produccion de ~2 million lbs pa U3O8 durante una vida útil de la mina de 17 años Ø High-grade leach feed averaging ~2,000ppm U3O8 for first five years Ø AISC bajo de US$34.5/lb U3O8 Ø Capital cost of US$230 million Ø 18-month construction timeline to first production in 2026 Ø 1n Extensional drill program at Tiris demonstrated significant resource growth potential with extensive mineralisation identified at both Hippolyte South and Sadi: · hipólito sur - High-grade shallow mineralisation defined over an 8km strike length with intercept grades of up to 1,170ppm U3O8 · Sadi - La mineralización se extendió más de 1.2 km al sur desde la tendencia mineralizada existente de 9 km. · An update of the Mineral Resource estimate for Tiris has commenced and expected to be delivered in the June quarter adding further value to the Tiris Uranium Project Balance Sheet secured with A$19 million cash as at 31 March 2024 after the Company completed a A$16.1 million placement and a A$4.3 million option funding agreement during the quarter. Further near-term funding is expected to be received from the completion of a A$2 million SPP. Management team strengthened with commencement of Managing Director and CEO Andrew Grove and appointment of Mark Somlyay as CFO, both of whom have extensive West African and development experience. Sweden announces official enquiry into lifting the uranium mining ban. The Company's Häggån Project contains very significant uranium Mineral Resources[ 2 ] of approximately 800 million lbs of U3O8. Post the reporting period: · Restructure of the historic Curzon offtake agreement[ 3 ], 16 2024 abril, materially increasing the price receivable for planned uranium production and releasing significant value for the Tiris Uranium Project, key points: · El precio promedio del contrato de precio fijo aumenta un 70% a US$74.75/lb U3O8 desde US$44.09/lb U3O8 sujeto a Decisión Final de Inversión antes del 31 de marzo de 2025 · Los volúmenes totales contratados (contratos de precio fijo y variable) se reducen de 2.6 millones de libras a 2.1 millones de libras durante el mismo plazo de 7 años. · US$41 million of additional revenue delivered to the Tiris Project cash flows at a uranium price of US$80/lb U3O8 · Proyecto NPV8 increases US$22 million to US$388 million and IRR improves 2% to 36% compared to Front End Engineering Design ("FEED") study economics[ 4 ] entregado en marzo de 2024 · Toma reestructurada para entregar 150,000 libras U3O8 por año bajo condiciones de precio fijo con un promedio de US$74.75/lb U3O8 y 150,000 libras U3O8 por año al contado menos 4% de descuento durante 7 años · Restructuring fee of US$3.5 million to be paid to Curzon either in cash or in Aura shares priced at A$0.18 per share · Curzon to also take a US$3.5 million placement of Aura shares at A$0.18 per share · Acciones sujetas a acuerdos de custodia · La colocación y liquidación se llevarán a cabo una vez concluida la documentación final y sujeta a que la capacidad de colocación de la Compañía se actualice en la próxima junta de accionistas. · General Meeting of shareholders called for 21 May 2024 to approve the Tranche two placement, placement options, A$2 million SPP shares and options · 10 April 2024 the second set of drilling results released from the 15,500 meter Tiris drilling program
|
Air core drilling at Sadi - Tiris | Downhole gamma survey at Sadi - Tiris |
Tiris Uranium Project, Mauritania
The Tiris Uranium Project, Mauritania, is a potential near-term, low-cost, long-life future uranium mine producing 2Mlbs pa U3O8 over the currently defined 17-year mine life with production expected to commence in 2026.
During the quarter activities continued to progress Tiris towards a Final Investment Decision ("FID") and ultimately development of Mauritania's first uranium mine, including:
· Completion of the Front End Engineering Design ("FEED") study
· Exploration drilling to expand Mineral Resources beyond the current 59Mlbs U3O8[ 5 ]
· Trial mining, trenching and variability sampling over Hippolyte
Tiris Uranium Project Front End Engineering Design Study
The FEED study was completed during the quarter and demonstrated Tiris to have the potential be a near-term, low-cost, long-life mine with exceptional further growth opportunities. The study also demonstrated the Project's excellent economics.
Aspectos destacados y resultados clave del estudio FEED[ 6 ]:
El estudio FEED avanzó en el diseño de la planta de procesamiento y la infraestructura para permitir preparar una estimación detallada de los costos operativos y de capital, con un nivel de precisión de entre +10% y 15%.
• Robusto Economía financiera del proyecto de caso base demostrada por el VPN después de impuestos8 of US$366M (A$523M) TIR del 34% y recuperación de la inversión en 2.5 años at realised uranium price of US$80/lb U3O8
• At uranium prices of US$100/lb U3O8 la economía aumenta al VAN después de impuestos8 US $ 596 millones (A$851M) y TIR 49%
• Vida útil inicial de 17 años con una producción promedio de 1.9 Mlbspa U.3O8 de la planta de proceso con capacidad de 2.0Mlbspa
• Producción de uranio Life of Mine (LOM) en este estudio fue 30.1 millones de libras U3O8
• 91% de los recursos minerales medidos e indicados en el cronograma de minería durante los primeros cinco años, el material inferido LOM totaliza el 33%, principalmente más allá de diez años en el cronograma de minería.
• La minería a cielo abierto es una Excavación sencilla, de bajo riesgo, poco profunda y libre. Inteligente sin necesidad de triturar y moler
• El beneficio del mineral proporciona una alimentación de lixiviación de alta ley con un promedio de 1,997 ppm U3O8 (primeros 5 años) y 1,743 ppm U3O8 (LOM), the high-grade leach feed is delivered to the plant for a very low cost of US$8.1/lb U3O8 including the cost of mining and beneficiation
• AISC has increased to US$34.5/lb U3O8, una escalada del 16% con respecto a la estimación de la EFS para 20233. Esto se debe en gran medida al aumento del 40% en el precio del combustible.
• CAPEX of US$230M, an escalation of 29% on the 2023 EFS estimate6 as a result of industry-wide escalation and increasing the filtering and water treatment capacity to allow for mayor flexibilidad y menor riesgo al operar. CAPEX forecast includes a 12% contingency.
• La producción de uranio prevista en 18 meses de la Decisión Final de Inversión
• El resultado de FEED confirma y ofrece un diseño de proceso mejorado para eliminar riesgos del proyecto.
• Perforación de exploración en marcha para expandir los recursos minerales más allá de los actuales 59Mlbs U3O8[ 7 ] con un definido Objetivo de exploración de Tiris East de entre 8 y 32 millones de libras adicionales3O8[ 8 ]
• El diseño modular ofrece oportunidades para una mayor expansión y escalabilidad eficientes en términos de capital.
• Planned construction and operation of the Tiris Uranium Project will deliver significant and ongoing benefits to the people of Mauritania in terms of employment opportunities including professional development training, new infrastructure, forecast taxes and royalties.
| Unidades | EFS de 2023[ 9 ] Caso base | FEED Caso base | FEED Precio de contado |
Precio del uranio | US $ / lb U3O8 | $65 | $80 | $100 |
Valoraciones y devoluciones |
|
| ||
VAN después de impuestos8 | US $ M | 226 | 366 | 596 |
TIR después de impuestos | % | 28% | 34% | 49% |
Periodo de recuperación | Años | 4.5 | 2.5 | 1.8 |
Resumen de flujo de caja |
|
| ||
Vida inicial mía | Años | 16 | 17 | 17 |
Producción LOM | Mlbspa U3O8 | 25.5 | 30.1 | 30.1 |
Producción anual | Mlbspa U3O8 | 1.6 | 1.9 | 1.9 |
Ingresos brutos (LOM) | US $ M | 1,562 | 2,257 | 2,818 |
Flujo de caja libre antes de impuestos (LOM) | US $ M | 906 | 1,327 | 1,876 |
Margen (LOM) | % | 58% | 58% | 79% |
Flujo de caja libre después de impuestos (LOM) | US $ M | 554 | 1,061 | 1,486 |
Costos operativos unitarios |
|
| ||
Todo en costo | US $ / lb U3O8 | 35.6 | 42.1 | 43.2 |
Costos de sostenimiento todo incluido | US $ / lb U3O8 | 28.7 | 34.5 | 35.5 |
Costo en efectivo C1 | US $ / lb U3O8 | 25.2 | 30.1 | 30.2 |
Costo capital |
|
| ||
Capital de desarrollo | US $ M | 178 | 230 | 230 |
Mesa 1 - El resumen financiero del proyecto de uranio Tiris demuestra una economía sólida
Figura 1 - Parámetros y sistemas operativos clave del Proyecto Tiris Uranio
La configuración modular de la planta de procesamiento se adapta bien a una expansión simple y eficiente en términos de capital para adaptarse al crecimiento futuro de los recursos minerales, como se indica a continuación.
Ø 2.0Mlbspa U3O8 capacidad de producción = US$ 230 millones de capital de desarrollo (caso base)
Ø 2.8Mlbspa U3O8 capacidad de producción = US$ 83M capital de expansión (de 2 a 2.8Mlbpa)
Ø 3.5Mlbspa U3O8 capacidad de producción = US$ 166M capital de expansión (de 2 a 3.5Mlbpa)
Tiris Exploration
An exploration review using newly acquired radiometric, historic radiometric and drilling data was used to develop an Exploration Target for additional of between 8-32 Mlbs U3O8[ 10 ]. The Exploration Target is immediately adjacent and contiguous to the existing Mineral Resource.
The recently completed 15,500m drill programme was undertaken to demonstrate the excellent Mineral Resource growth potential in the Tiris area and to further enhance the Project value through either extending mine life and/or expanding production capacity in the future.
During the March quarter the first batch of results from 793 holes including 3,304m of drilling was released. Subsequent to the end of the quarter, drilling was completed on 4 April and the second batch of results released on 10 April.
Drilling has defined two new areas[ 11 ] de mineralización extensa poco profunda y de alta ley tanto en Hippolyte South como en Sadi y numerosas extensiones de mineralización conocida sobre las otras áreas de recursos minerales que deberían agregarse materialmente a los recursos minerales existentes de 59 millones de libras U3O8[ 12 ].
· hipólito sur - Mineralización poco profunda de alta ley ahora definida en una longitud de 8 km.
· Sadi - La mineralización se extendió más de 1.2 km al sur desde la tendencia mineralizada existente de 9 km.
Results released during the quarter included:
· Hipólito Sur: New high-grade mineralisation defined over an extensive 6km2 area. Mineralisation extended to the east and northwest from the previous resource areas and to the southwest for over three kilometres and remains open, Figure 2
High-grade intercepts include:
· 4.8 m nivelación 1,170 ppm U3O8 from 0.5m (23FEAC000389)
· 2.2 m nivelación 802 ppm U3O8 from 0.6m (23FEAC001079)
· 3.2 m nivelación 555 ppm U3O8 from 0.2m (23FEAC000997)
· Sadi: Mineralisation extended over 1.2 kilometres south and west from the current resources and remains open, Figure 3
· Hippolyte West C: Drilling extended mineralisation linking the three previously separate resource areas, Figure 8
· Mineralised intercepts were returned from low and very low strength radiometric anomalies, significantly increasing the exploration potential of the Tiris East area as these have been ignored in past exploration
Figura 2. Hippolyte South: muestra la ley*espesor de este programa junto con los de perforaciones anteriores en relación con las anomalías radiométricas U aéreas y los contornos de recursos actuales. Drilling has confirmed significant new mineralisation outside the resource outlines.
Figure 3. Sadi: showing grade*thickness from this program along with those from previous drilling in relation to airborne U-radiometric anomalies and current resource outlines. Drilling has confirmed significant new mineralisation outside the resource outlines. Drilling has confirmed significant mineralisation outside the resource outlines. Most significant intercepts occur on low strength radiometric anomalies.
Other Tiris Activities
During the quarter other activities undertake at Tiris included:
The Company initiated a program to generate additional information on the variability and optimisation of processing parameters through the first 4 years of the mine schedule. The first step was a program of trenching in the Hippolyte Resource with a series of aims, including:
1. Generate samples for variability testing
2. Confirm beneficiation response of Hippolyte material
3. Demonstrate mining parameters
At Hippolyte Zone 3 area a total of 7 trenches were dug with 74 variability samples and 13 bulk samples collected. The variability samples will be processed at Aura's Nouakchott laboratory to confirm the concentration factor of uranium to the -75 micron screen fraction and the distribution of minerals, including sulphate and clay minerals. This information will be included in the Tiris geometallurgical model and provide inputs for further optimisation of the mine schedule.
Various measures for improving community and government engagement have commenced including developing a framework for a more formal community consultation process.
Hippolyte trench excavation | Hippolyte bulk sample collection |
Figure 4 - Tiris Uranium Project Hippolyte Zone 3 variability sampling
Actualización del proyecto Häggån
The Häggån Polymetallic Project, located in the municipality of Berg in the county of Jämtland, hosts a globally significant 2 billion tonne polymetallic Mineral Resource[ 13 ] which includes 800 Mlbs of U3O8[ 14 ]. The primary metals and minerals in Häggån are vanadium, sulphate of potash ("SOP") and uranium, with nickel, molybdenum and zinc also present.
Approximately 14 percent of the known value of the asset is uranium. Including uranium into the previously published scoping study[ 15 ] increased the Project NPV by 37% at a uranium price of US$65/lb U3O8 from the previously stated range of between US$456 million to US$1,307 million.
The Swedish Government announced on 23 February 2024 the launch of an inquiry into overturning the existing ban on mining uranium, which has been in place since 2018. The inquiry will investigate the regulatory changes needed to make uranium extraction legal and analyse whether mining of uranium should be allowed. The conclusions of the inquiry will be presented on the 15 of May 2024. Once the results of the inquiry are published, the Government can choose to go forward with a legislative proposal to Parliament.
On 19 March, at the invitation of Minister for Energy, Business and Industry Ebba Busch, Aura executives attended a mining industry roundtable in Stockholm, along with Swedish mining industry leaders. The purpose was to provide input into the development of the Swedish government's minerals policy.
Aura continues to prepare its submission for an exploitation permit for the Häggån project, which will provide a 25-year tenure.
A 13-hole drilling program was completed in January 2024. All drillholes will be used for hydrological testing, mapping water movements and to establish hydrological baseline.
The test work by Geosyntec for the concession application continued, with hydrological testing, water sampling and characterisation of the ore and waste rock.
In response to the questions and comments arising from a series of community consultations in late 2023, and from engagement with the local County Administrative Board, Aura is undertaking further information gathering work on the project. This work includes data collection on water flows, biodiversity baseline monitoring and an impact assessment of planned activities on areas of potential reindeer husbandry.
Actividades corporativas
Option Funding Agreements
On 25 January 2024, the Company announced that it had entered into Option Funding Agreements with investors who have agreed to prepay the Company approximately A$4.3 million, equal to the exercise monies for all remaining options expiring 30 June 2024. The funds will be repaid upon receipt of option exercise monies as and when the current Option holders exercise their options.
In addition, the Company entered into an underwriting agreement for el ejercicio de 20 million options with PAC Partners Securities Pty Limited, whereby the Underwriter will receive shares equal to the number of shares to be issued on exercise of 100% of the Underwritten Options that are not exercised by the Option Holders by the Option Expiry Date, in lieu of cash. As at 31 March 2024, A$3.7 million remains outstanding under the Option Funding Agreement.
The Options are listed and have an expiry date of 30 June 2024 and an exercise price of A$0.052 each, and on issue convert into ordinary fully paid shares in the Company.
12.0 million options expiring 30 June 2024 at an exercise price of A$0.052 per share were exercised during the reporting period with a further 6.7 million options exercised subsequent to the reporting period. As at 17 April 2024, 64.9 million options remain outstanding.
Private Placement and Share Purchase Plan
On 18 March 2024, the Company announced a placement to professional and sophisticated investors to raise approximately A$16.2 million through the issue of approximately 90.2 million fully paid ordinary shares at A$0.18 per share. The Company will also offer eligible shareholders on 15 March 2024, the opportunity to participate in a Share Purchase Plan ("SPP") of up to A$2 million through the issue of approximately 11.1 million fully paid ordinary shares subject to shareholder approval.
Participants in the new share issues pursuant to the Placement and the SPP will also receive three new options for every four shares subscribed. The Options are intended to be listed subject to satisfying the quotation requirements of ASX and will have an exercise price of A$0.30 and expiry of two years. Approximately 67.7m options are anticipated to be issued in connection with the Placement and up to 8.3m options through the SPP.
The first tranche of the placement raising approximately A$16.1 million before costs via the placement of 89,668,896 Shares at A$0.18 was completed on the 25 March 2024.
A General Meeting to approve the issue of the Shares and Options under the Tranche 2 Placement, SPP Shares, SPP Options and directors' participation in the Placement has been convened for the 21 May 2024.
Directors have committed A$0.13 million to the Placement.
Cash and Cash Forecast
The Company's cash position as of 31 March 2024 was A$19.0 million. The Company's major cashflow movements for the quarter included:
· Net proceeds from the Share Placement of A$15.1 million;
· Net proceeds from Options Funding Agreements of A$3.6 million;
· Investments in the Company's Exploration and Evaluation assets of A$4.03 million;
· Admin and corporate costs of A$1.13 million; and
· Staff costs of $0.47 million.
The forecasted net operating cashflow and investment in the Company's exploration and evaluation assets for the coming quarter is A$5.73 million. With a closing cash balance of A$19.0 million, the company has enough cash for 3.31 quarters.
Administración
Andrew Grove was appointed Managing Director and CEO on the 30 January 2024 replacing Dave Woodall. Mr Grove is a highly experienced mining and finance executive with extensive global industry experience across multiple commodities. This includes more than 30 years of managerial, technical, commercial and finance experience, including significant expertise in uranium and West African development and operations.
Mark Somlyay was appointed CFO of Aura on the 26 March 2024, commencing 22 April 2024. Mr Somlyay has more than 20 years' experience in finance, commercial and business improvement within the mining industry. Importantly, the majority of his experience has been in West Africa and in francophone jurisdictions, where he has been involved in the recent development of three greenfield projects.
Both appointments will have a positive impact on the Companies endeavours towards progressing Tiris towards development.
Management participated in the Indaba conference and undertook site visits to both Tiris and Häggån during the quarter.
Remuneration Consultant
The REM Committee engaged remuneration consultants to provide guidance on a competitive, market related remuneration program for senior executives and non-executive directors.
June Quarter Planned Activities
At Tiris the next steps in progressing towards the construction and development of the Project that will be undertaken or commenced during the next quarter include:
• Release final drill results from the recently completed drilling program
• Completion of Mineral Resource update for Tiris East including all new drilling information
• Engagement with Project funding providers
• Furthering offtake contract negotiations
• Water targeting and drilling to confirm and develop water infrastructure sufficient to support future operations
• Review of engineering and capital cost optimisation
• Geometallurgy, engineering and design work to support development activities
• Ongoing baseline environmental and radiation monitoring
• Commencement of formal community consultation
• Engagement with government on approvals and development timelines
At Häggån the planned licensing activities include:
• Analysis of water flows
• Biodiversity baseline study
• Reindeer impact assessment
• Continued preparation for exploitation permit licence submission
March 2024 Quarter ASX Announcements
This Quarterly Activities Report contains information extracted from ASX market announcements reported in accordance with the 2012 edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" ("2012 JORC Code"). Further details (including 2012 JORC Code reporting tables where applicable) of exploration results referred to in this Quarterly Activities Report can be found in the following announcements lodged on the ASX:
· Commencement of extensional drilling program at Tiris 5 January 2024
· Options funding agreements secure A$4.3M for Tiris 25 January 2024
· Aura Energy appoints Andrew Grove as Managing Director &CEO 30 January 2024
· Sweden initiates inquiry to overturn uranium mining ban 26 February 2024
· Aura's Tiris FEED Study returns Excellent Economics 28 February 2024
· Tiris drilling defines extensive new uranium mineralisation 12 March 2024
· Successful A$16.2 Million Placement and SPP Offer 18 March 2024
· Aura appoints a Chief Financial Officer 26 March 2024
These announcements are available for viewing on the Company's website auraenergy.com.au. Aura confirms that it is not aware of any new information or data that materially affects the information included in any original ASX announcement.
Resumen de viviendas
La Compañía posee la siguiente participación en tenencias mineras, acuerdos de participación y cesión de derechos al final del Trimestre:
Table 1 - Tenement Summary
Vivienda No. | Nombre | Fecha de concesión/solicitud | Expiración | Km2 | Soporte | Equidad |
Mauritania | ||||||
2491C4 | Ain Sder | 8/02/2019 | 7/02/2049 | 207 | Recursos Tiris SA | 85% |
2492C4 | Oued El Foule | 8/02/2019 | 7/02/2049 | 190 | Recursos Tiris SA | 85% |
2490C4 (anteriormente 561) | Oum Ferkik | 19/05/2017 | Pending approval of application for Exploitation License | 60 | Aura energía limitada | 100% |
2365B4 | Oued El Foule Sud | 04/12/2023 | 03/08/2026 | 166 | Aura energía limitada | 100% |
2457B2 | Hadeibet Belaa | 08/12/2023 | 07/08/2026 | 41 | Compañía Minera Internacional Tiris. | 100% |
2458B2 | Touerig Taët | 08/12/2023 | 07/8/2026 | 134 | Compañía Minera Internacional Tiris. | 100% |
Suecia | ||||||
2007 - 243 | Häggån nº 1 | 28/08/2007 | 28/08/2024 | 18 | Vanadis Batería Metales AB | 100% |
2016:9 | Möckelåsen nr 1 | 21/01/2016 | 21/01/2024 (extension applied for) | 18 | Vanadis Batería Metales AB | 100% |
2016:7 | Skallböle nr 1 | 20/01/2016 | 20/01/2024 (extension applied for) | 8 | Vanadis Batería Metales AB | 100% |
Farm-in agreement with Nomads Mining Company sarl, Mauritania, Aura, through subsidiary Archean Greenstone Gold has earned a 70% interest in Nomads 100%-owned exploration permit in Mauritania (refer to ASX announcement 11 June 2019).
EXTREMOS
La Junta Directiva de Aura Energy Ltd ha aprobado este anuncio.
Este Anuncio contiene información privilegiada a los efectos de la versión del Reino Unido de la regulación de abuso de mercado (UE No. 596/2014), ya que forma parte de la legislación nacional del Reino Unido en virtud de la Ley de la Unión Europea (Retirada) de 2018 ("UK MAR" ).
Para más información, por favor póngase en contacto con:
Andrés Arboleda Director Gerente y CEO Aura energía limitada +61 414 011 383 | Paul Ryan mañana sodali Relaciones con inversores y medios +61 409 296 511 | SP Ángel Finanzas Corporativas LLP Asesor nominado y Broker david hignell Kasia Brzozówska conceder panadero +44 203 470 0470 |
Sobre Aura Energy (ASX: AEE, AIM: AURA)
Aura Energy es una empresa minera con sede en Australia con importantes proyectos de uranio y polimetálicos en África y Europa.
La Compañía se centra en el desarrollo de una mina de uranio en el Proyecto de Uranio Tiris, un importante descubrimiento de uranio totalmente nuevo en Mauritania. El estudio FEED de febrero de 2024 demostró que Tiris es una mina de uranio de 2 millones de libras de U3O8 pa de bajo costo a corto plazo con una vida útil de 17 años con una excelente economía y la opción de expandirse para adaptarse al crecimiento de recursos.
Aura planea pasar de ser un explorador de uranio a un productor de uranio para capitalizar la creciente demanda de energía nuclear a medida que el mundo avanza hacia un sector energético descarbonizado.
Más allá del Proyecto Tiris, Aura posee el 100% del Proyecto Häggån en Suecia. Häggån contiene recursos de vanadio, sulfato de potasa ("SOP") y uranio a escala mundial de 2.5 millones de toneladas. Utilizando solo el 3% del recurso, un estudio de alcance de 2023 describió una vida útil de la mina de 27 años basada en la extracción de 3.5 Mtpa.
Descargo de responsabilidad con respecto a las declaraciones a futuro
Este anuncio de ASX (Anuncio) contiene varias declaraciones prospectivas. Todas las declaraciones que no sean declaraciones de hechos históricos son declaraciones prospectivas. Las declaraciones a futuro están inherentemente sujetas a incertidumbres en el sentido de que pueden verse afectadas por una variedad de riesgos, variables y factores conocidos y desconocidos que podrían causar que los valores o resultados reales, el desempeño o los logros difieran materialmente de las expectativas descritas en dichas declaraciones a futuro. declaraciones. La Compañía no ofrece ninguna seguridad ni garantía de que se lograrán los resultados, el desempeño o los logros previstos, expresados o implícitos en esas declaraciones prospectivas.
Declaración de personas competentes
La persona competente para calcular las intersecciones significativas es el Sr. Arnold van der Heyden de H&S Consulting Pty Ltd. La información del informe al que se adjunta esta declaración que se relaciona con la estimación de recursos minerales para 2023 se basa en información compilada por el Sr. van der Heyden. . El Sr. van der Heyden tiene suficiente experiencia relevante para la estimación de recursos para calificar al Sr. van der Heyden como una Persona Competente tal como se define en la edición de 2012 del 'Código de Australasia para la presentación de informes de resultados de exploración, recursos minerales y reservas de mineral'. El Sr. van der Heyden es empleado de H&S Consultants Pty Ltd, una firma de consultoría geológica con sede en Sydney. El Sr. van der Heyden es miembro y profesional colegiado del Instituto Australasiano de Minería y Metalurgia (AusIMM) y acepta la inclusión en el informe de los asuntos basados en su información.
La persona competente para los datos de los pozos de perforación es el Dr. Michael Fletcher. La información del informe al que se adjunta esta declaración que se relaciona con la compilación de estimaciones de recursos y los datos de los pozos de perforación se basa en información compilada por el Dr. Michael Fletcher. El Dr. Fletcher tiene suficiente experiencia relevante en la preparación y compilación de datos de exploración en una amplia gama de depósitos para calificar como Persona Competente según se define en la edición de 2012 del 'Código de Australasia para la presentación de informes de resultados de exploración, recursos minerales y reservas de mineral'. El Dr. Fletcher es consultor de Aura Energy y empleado de tiempo completo de GeoEndeavours Pty Ltd. El Dr. Fletcher es miembro del Instituto Australasiano de Geocientíficos y consiente la inclusión de esta información en el informe.
La persona competente para interpretar la información gamma del fondo del pozo, los análisis de desequilibrio y los resultados de los ensayos es el Sr. David Wilson. El Sr. Wilson tiene experiencia suficiente que es relevante para el estilo de mineralización y el tipo de depósito bajo consideración y para la actividad que está realizando para calificar como una Persona Competente tal como se define en la edición de 2012 del 'Código de Australasia para la presentación de informes de resultados de exploración'. Recursos minerales y reservas de mineral'. El Sr. Wilson es consultor de Aura Energy y empleado de tiempo completo de 3D Exploration. El Sr. Wilson es miembro del Instituto Australasiano de Geocientíficos y consiente en la inclusión en el informe de los asuntos basados en su información.
The Tiris Uranium Resource Estimate was reported in 2023 under the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". The Mineral Resource Estimate was detailed in ASX announcement: "Major Resource Upgrade at Aura Energy's Tiris Project" 14th February 2023. Aura confirms that it is not aware of any new information or data that materially affects the information included in this announcement regarding the mineral resources and that all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed.
6 ASX and AIM Release: "Aura's Tiris FEED Study Returns Excellent Economics" 28 Feb 2024
RNS puede usar su dirección IP para confirmar el cumplimiento de los términos y condiciones, para analizar cómo interactúa con la información contenida en esta comunicación y para compartir dicho análisis de forma anónima con otros como parte de nuestros servicios comerciales. Para obtener más información sobre cómo RNS y la Bolsa de Valores de Londres utilizan los datos personales que nos proporciona, consulte nuestra Política de privacidad.